Update 8/25/20 --
Got some goodies in from VTT
Pulled my 1-step colder injectors out (L to R is 6 - 1)
Pulled the VC and cleaned up all the chipmunk poop from the engine bay...
Tapped the PCV head ports
Plugged them with 10-32 x 3/16 set screws
Cleaned the whole head surface to get ready to put the VC on...
Got the VTT VC on with loose screws while I figure out other stuff!
Got some goodies in from VTT
Pulled my 1-step colder injectors out (L to R is 6 - 1)
Pulled the VC and cleaned up all the chipmunk poop from the engine bay...
Tapped the PCV head ports
Plugged them with 10-32 x 3/16 set screws
Cleaned the whole head surface to get ready to put the VC on...
Got the VTT VC on with loose screws while I figure out other stuff!