Dropped the car off at the shop yesterday. It will be there for a month getting a few things done. Below is Phase 1 of the build. The goal for this year is to get a solid foundation to work off of for next year. Get the car running and make a few passes down the strip and tackle a few other things this year like the suspension.
If anyone follows the other forum or daft335 on Instagram, then you know this time attack car that's on the lift. If not, definitely look him up. I chose this shop because of the quality of work put into this car, and after seeing it in person, regret nothing.
- 10 point NHRA approved cage
- Custom aluminum dash using a tablet running MHD as the gauge cluster instead of the OEM
- Aluminum control panel for various switches
- Front fender work to fit Hoosier 27.5" x 4.5" tires
- Hood exhaust
- Custom chargepipe with Turbosmart BOV since AC and power steering is deleted
- Custom cold side intercooler pipe
- Custom hot side intercooler pipe
- Walnut blast
- Oil cooler delete
- Install AeroCatch hood pins
- Install hydrobrake
- Install parachute handle and cable
- Install window net
- Install fire extinguisher
- Headlight delete
- Drive shaft loop
If anyone follows the other forum or daft335 on Instagram, then you know this time attack car that's on the lift. If not, definitely look him up. I chose this shop because of the quality of work put into this car, and after seeing it in person, regret nothing.
Last edited: